SERRO | The Heights by Emaar | 3 Bedroom Villa for Sale



$1,686,400
AED 6.2M

RERA Broker Number: 41791
ozlem@allegiance.ae
3 Bedroom
BUA: 3,402 sq.ft.
Completion: May 2030
Plot Area: approx. 4,904 sq.ft.
The Heights
SERRO at The Heights is an exclusive collection of contemporary villas developed by Emaar Properties, one of the world’s most respected real estate developers. Located within the master-planned The Heights Country Club & Wellness community, this elegant 3-bedroom villa with a built-up area of 3,402 sq.ft. offers a refined blend of luxury, wellness-focused living, and nature-inspired design. The project is thoughtfully crafted to provide residents with a serene lifestyle surrounded by landscaped greenery, water features, and tranquil walking trails, creating a peaceful retreat while still maintaining excellent connectivity to Dubai’s major destinations.
Inside the villa, residents will experience spacious open-plan interiors designed with soft neutral tones, floor-to-ceiling windows, and premium finishes that create a bright and sophisticated atmosphere. The architecture reflects a Mediterranean-inspired aesthetic with clean lines, warm materials, and seamless indoor-outdoor connections that allow natural light and landscaped views to become part of everyday living. These villas are designed as private lifestyle retreats, offering generous living spaces, elegant bedrooms, and outdoor areas perfect for relaxing or entertaining, making them ideal for families and investors seeking high-quality homes within a wellness-centric community.

Amenities
🏊 Community swimming pool
🧒 Kids play areas & playscape
🧘 Wellness centre & yoga areas
🏋️ Indoor & outdoor gym
🏀 Sports courts
🌿 Linear parks & nature trails
☕ Community retail & cafés
🏡 Clubhouse & social spaces
🌊 Landscaped water features & lakes
🚴 Jogging & cycling tracks

Payment Plan
10% — On booking
• 10% — March 2026
• 10% — September 2026
• 10% — March 2027
• 10% — September 2027
• 10% — March / April 2028 (40% construction completed)
• 10% — August / October 2028 (60% construction completed)
• 10% — January / March 2029 (80% construction completed)
• 20% — March / May 2030 (100% construction completed)




